House under construction in a quiet area but close to the main services.
It is expected to be completed in September 2023 with the following details:
- Thermolacquered wood kitchen in white with a semi-gloss finish;
- Silverstone worktops;
- One and a half bowl sink by Teka;
- Fully equipped with Teka appliances: vitroceramic induction hob, oven, microwave, side-by-side fridge, dishwasher and washer/dryer;
- Sanitary facilities with Roca hanging dishes, Roca taps and shower ramp;
- Shower tray with glass enclosure;
- Love brand floor coverings;
- Doors and closets lacquered in white;
- Stainless steel door handles;
- All the flooring inside the house in oak-colored vinyl (or similar);
- Central vacuum system installed;
- Video intercom;
- Barbecue area;
- Sidewalks around the house and floors of the car shelters with anti-slip flooring;
- Swimming pool with chlorine treatment;